Custom Board Game Tables

Locally Crafted in Calgary Alberta Canada

I design and build custom board game tables in my Calgary woodshop for people who value quality craftsmanship, thoughtful design, and meaningful time spent together. Each table is designed around how you play and who you play with, creating a dedicated space where memories are built and shared.

Every table is crafted from premium solid hardwoods using both modern and timeless techniques. The result is an heirloom quality board game table that is built for longevity, outlasts trends, and becomes a lasting piece that quietly holds the memories made around it.

My game tables are built for you and your games while still functioning beautifully as a piece of fine furniture in your home. Thoughtful proportions, durable construction, and intentional design ensure your table feels just as right during everyday life as it does on game night.

Designed Around How You Play

No two groups play the same way, and no two spaces are the same. That is why every custom board game table I build begins with a conversation. I work closely with you to understand how you play, how you gather, and how the table will be used in your home. With a wide range of options, accessories, and design styles available, the possibilities are extensive, but never overwhelming.

Your preferences and the way you want to interact with the table will guide the design and the features that are selected. With my guidance and years of hands on experience, we narrow the options down to what truly matters and arrive at a game table that feels, intuitive, and right for you and your space

Your game table is designed from the ground up to match:

  • The types of games you play

  • The size of your group you want seat

  • The room the game table will live in

  • How often your board game table will be used for gaming versus everyday life

The result is a game table that feels intuitive to use, comfortable to gather around, and intentional in both function and appearance.

The Build Process

I work closely with you from the first conversation through to final delivery, and you work directly with me at every stage. From our initial discussion to the moment your board game table arrives at your door, I am hands on and involved throughout the entire build.

Initial Conversation

We begin by discussing your space, your goals for the table, and what you want it to bring to your home. We talk through how you play, the features you are interested in, and any custom elements that will make the table personal and one of a kind.

This first conversation is about getting to know you and your vision, while also giving you a better understanding of the craftsperson designing and building your custom board game table (that’s me). My goal is to build trust and comfort from the very beginning so the design and build process feels clear, collaborative, and as enjoyable as possible.

Design Alignment and Quoting

Based on our discussion, I develop a clear design direction and detailed quote. I provide visual references and renderings to help you see how the table will look and how custom elements come together. This ensures we are aligned and envisioning the same final result before moving into the build phase.

Queue Holding Deposit

A $250 queue holding deposit secures your place in my build schedule and allows final details to be refined and confirmed before materials are ordered.

Material Selection and Build

As your build window approaches, I personally select the hardwoods for your table and begin the build in my Calgary shop. Throughout the process, small refinements may be made to ensure the best possible outcome. Any major changes are always discussed and approved in advance. You are welcome to follow along on my Instagram and YouTube channel to see behind the scenes progress and what goes into creating a custom board game table.

Delivery or Shipping

Finished tables are either delivered locally or shipped across Canada and the United States in custom built foam lined crates. Each crate is designed and packed by me for maximum protection during transit. All shipments are fully insured and secured using durable, heavy duty packing materials so your table arrives safely and ready to be enjoyed.

After Delivery

My involvement does not end once your table is delivered. I genuinely care about how the table is working for you, the time spent around it, and the memories being made on it. Staying connected after delivery allows me to make sure everything continues to feel right as the table becomes part of your home.

If questions come up or something does not feel quite right, I am always an email away. I take pride in addressing concerns promptly and thoughtfully, and I am always happy to help with care, maintenance, or any adjustments that may be needed over time. I also love seeing and hearing about these tables in action and how they are being enjoyed.

Your table is built to last for years, and my support is part of that commitment.

Design and Feature Options

Every custom board game table is tailored to your needs. Features are selected intentionally and with purpose, never added for the sake of complexity. The goal is a table that feels cohesive, functional, and designed specifically for how you play and gather.

Size and Layout

  • Common standard sizes are available, as well as fully custom sizing

  • Layouts designed around your preferred games and seating needs

  • Comfortable reach, spacing, and player interaction

  • Multiple armrest width options to suit both style and function

Wood Choice

I primarily work with premium hardwoods known for durability and long term beauty, including:

  • Walnut

  • Maple

  • Cherry

  • White Oak

I can also source a wide variety of other domestic and exotic hardwoods depending on the look and feel you are trying to achieve.

Table Style

The style of your table can influence both gameplay and the atmosphere around it. Available shapes include:

  • Rectangular

  • Hexagonal

  • Circular

  • Square

Each shape offers a different experience, and I help guide this decision based on how you play and how the table will be used.

Tables also can have different armrest widths and styles to add to your game play. Available armrest styles

  • Wide (6”+)- A wide version that allows for a comfortable playing experience and additional accessories to be added

  • Slim (3”)- A narrower version for a slim and modern look to the table focused on maximizing game play area

  • Player stations- Individual player stations that flip out to increase playing and storage area or can be closed when added playing area is not needed. They are 6” wide when closed and 12” deep when open

Base Options

I offer a range of base styles to complement your space, your design preferences, and the overall presence of the table.

  • Four post base with tapered legs as my standard option

  • Trestle bases

  • Farmhouse bases

  • Pedestal bases

  • Metal bases

  • Fully custom designed bases

Personalization

  • Custom engravings and inlays can be added for a personal and meaningful touch

All features are discussed and refined during the design phase to ensure the final table feels intentional and well balanced. For more detailed information and design considerations, please refer to my Game Table Build Guide.

Playing Surface

  • Vault depth typically ranges from 2.25 inches to 3.25 inches depending on the table design

  • Custom vault depths can be accommodated upon request

  • Each table includes a neoprene rolling mat for quiet rolling and smooth movement of components, a wide range of colors, terrains, grids, and custom images are available

  • Designed to protect game components and improve gameplay

  • Easy to clean and maintain

Images of the different color and terrain options fort he neoprene rolling mats that come with each board game table

Accessories and Magnetic Game Rail

Accessories and the optional magnetic game rail are what truly elevate gameplay. With a wide variety of options available, your game nights can be customized to suit your style of play.

  • Cup holders

  • Wine glass holders

  • Component tray organizers

  • Card holders

  • Dice bins

  • Dice towers

  • Player desks and player stations

  • Dungeon Master screens and stations

If you choose not to include the magnetic game rail, there are still many built in options such as armrest component organizers, dice bins, drawers and card slots to keep gameplay organized and comfortable.

Toppers

Removable table toppers allow your game table to transition easily from game time to dinner time.

  • Full table toppers that convert the table for dining or gathering

  • Available in both over armrest and inset styles

  • Water resistant gasket helps protect against spills and everyday messes

  • Designed to maintain the look and feel of a dining table

  • Optional topper blocks available for secure storage when not in use

Pricing and Investment

I believe in being upfront so you can decide early on whether we are a good fit. Every custom board game table varies in price based on a number of factors, and I work closely with you to develop a table that truly reflects you, your games, and the space it will be played in.

Typical Price Range

Custom board game tables typically start at $4,000 CAD and can extend into the $25,000+ CAD range depending on the level of customization. Game tables can be designed with a more streamlined approach or fully tailored with custom features and detailing to suit your vision.

What Influences Board Game Table Pricing

  • Wood species

  • Size and proportions

  • Custom elements and features

  • Overall complexity of the build

  • Delivery or shipping requirements

If budget is your primary concern or you are looking for a low cost option, my work may not be the right fit. My focus is on long term value, craftsmanship, and game tables that are built to build memories around. I aim to create tables that live in your space for many years, outlast trends, and remain an evergreen part of your home. Please refer to my Game table pricing guide for more details on accessories and options available.

Timeline Expectations

Once your build begins, most custom board game tables take approximately 2 to 5 weeks to complete. Additional time may be required for highly customized designs or specialty features.

This timeline allows me to carefully select materials, craft the table using precise joinery techniques, and apply a durable finish that supports years of use. I work efficiently while never rushing the process, ensuring each table receives the attention it deserves. If anything changes along the way, I stay in close communication so you are always informed about the progress of the table you have invested in.

Craftsmanship You Can Trust

  • Built in Calgary, Alberta

  • Red Seal Carpenter

  • 8 years of professional building experience

  • Premium hardwoods only

  • Strong client reviews and published work

  • One builder from start to finish (that’s me)

I do not offer a traditional written warranty, but I stand behind my craftsmanship. If something does not feel right, I want you to reach out. Normal wear, misuse, and negligence are not covered, but genuine craftsmanship issues will always be addressed. I think of it as a common sense approach. If you believe there is a problem, we will talk it through and find the right solution together.

My relationship with my clients does not end at delivery. If you ever need assistance with a game table I have built, it always starts with a conversation.

Check out my about page to learn more about me

The red seal certification icon given to apprentices that have successfully completed their training

Game Table FAQ’s

Ready To Start Your Custom Board Game Table?

After reading through this page and you think I may be a good fit for your custom board game table, the next step is to start a conversation with me, fill out the form below and we can begin this journey together. It gives you clarity on what is possible while allowing me to understand your space, your goals, and how I can best guide the project from the very beginning.

Fill out my contact form below to start the conversation.